Coláiste Chiaráin Secondary School

Project
Main Contractor

Coláiste Chiaráin Secondary School
MMD Construction Ltd.

O’Reilly Concrete were contracted by MMD Construction Ltd. to design, manufacture and fit the full precast concrete frame for Coláiste Chiaráin Secondary School, Croom, Co. Limerick.

MMD Construction proposed a change from the tender stage design to a precast concrete solution from O’Reilly Concrete in order to fit a tight design programme. We provided all precast walls, columns, beams, and floors to meet the design requirements.

This two-storey building covers 10,000m² on the 22-acre site and is the new era of education for County Limerick. It offers more than 60 teaching spaces to facilitate delivery of the widest-possible curriculum, has 3 full-size playing pitches for GAA, rugby and soccer.

Construction began on this project in the last quarter of 2018. MMD Construction handed over the very impressive build in December 2020 and we are very proud to see what our hard work has achieved. We hope the staff and students can look forward to a fantastic future in their new campus.

O’Reilly Concrete are delighted to have been involved in such a successful project as it offers state-of-the-art education facilities to the local community.

Products Used

Coláiste Chiaráin Secondary School

Project:
Main Contractor
Coláiste Chiaráin
MMD Construction

O’Reilly Concrete were contracted by MMD Construction Ltd. to design, manufacture and fit the full precast concrete frame for Coláiste Chiaráin Secondary School, Croom, Co. Limerick.

MMD Construction proposed a change from the tender stage design to a precast concrete solution from O’Reilly Concrete in order to fit a tight design programme. We provided all precast walls, columns, beams, and floors to meet the design requirements.

This two-storey building covers 10,000m² on the 22-acre site and is the new era of education for County Limerick. It offers more than 60 teaching spaces to facilitate delivery of the widest-possible curriculum, has 3 full-size playing pitches for GAA, rugby and soccer.

Construction began on this project in the last quarter of 2018. MMD Construction handed over the very impressive build in December 2020 and we are very proud to see what our hard work has achieved. We hope the staff and students can look forward to a fantastic future in their new campus.

O’Reilly Concrete are delighted to have been involved in such a successful project as it offers state-of-the-art education facilities to the local community.