Entries by O'Reilly Concrete One

,

Student Accommodation Construction Development Dublin

This student accommodation development on Carman’s Hall in Merchants Quay, Dublin is a purpose-built 207-bed development. The Crosslane Student Student Developments scheme comprises of three residential buildings of between three and six storeys, with 207 high-specification en-suite beds arranged in cluster apartments of between five to eight bedrooms. The development will also feature significant dedicated communal areas, […]

Pre-Stressed Wall Panels used for Horse Stables

Fantastic job of horse stables recently refurbished in Middleton, County Cork with the aid of our Pre-Stressed Wall Panels. The 95mm thick walls extended the height on top of an existing Insitu wall to create a firewall whilst acting as a divide between the stables on one side and a warehouse on the other. The […]

O’Reilly Concrete win prestigious award – investing in the Health of all Employees – at Irish Concrete Federation Awards in Kildare

O’Reilly Concrete win prestigious award – investing in the Health of all Employees – at Irish Concrete Federation Awards in Kildare – presented by Minister Pat Breen T.D. The Irish Concrete Federation Management Seminar and Annual General Meeting was held on Tuesday 6th November in the Keadeen Hotel, Newbridge, Co Kildare. Awards were made to […]

,

Prestressed Wall Panels for this Cattle Shed

Some images of a fantastic job nearing completion in Bellewstown, County Meath. The Beef Farmer used the O’Reilly Concrete 95mm thick x 2m Prestressed Wall Panels for this Cattle Shed. Our wall panels are strong, can be erected in double-quick time, are easy to clean and can be easily removed and placed elsewhere. For more […]

,

145mm Pre-Stressed Walls for Warehouse

Progress pictures of 145mm Pre-Stressed Walls for Warehouse – Mac Mahon Storage and Distribution ltd Moynalty, Co.Meath. We can unveil the finished article with the floor and roof both installed. O’Reilly Concrete also supplied the 600m3 of Readymix Concrete for the floor which was poured in 2 days by Barcrete Ltd. Thanks to Sean Mac […]